Ergon Bio Tank - Anaerobic & Aerobic + Evapotranspiration - ZERO Discharge Wastewater Treatment
Eco-Engineered | IGBC Net Zero Energy | Zero Odor | Zero Sludge.
The Ergon Bio Tank by Ergon INC. is an advanced, eco-friendly wastewater treatment solution that utilizes Bio-Nano Technology to seamlessly integrate STAGE I Anaerobic & STAGE II Aerobic biological processes with natural evapotranspiration ensuring complete treatment without electricity, chemicals, or mechanical equipment. Engineered to harmonize biological science with green design innovation, the system converts household and institutional sewage into clear, odorless, Option Available, Recharge, Re reusable water, achieving Zero-Energy, Zero-Discharge, and Net-Zero wastewater treatment benchmarks aligned with India’s sustainable development goals.
Designed for residential, institutional, commercial, and light industrial projects, the Ergon Bio Tank replaces conventional septic systems with a sustainable, compliance-ready sanitation solution that delivers long-term environmental protection, operational reliability, and green building compatibility.
Stage I Primary – Ergon Bio Collection Tank HSN Code : 6810 Anaerobic (oxygen-free) biological digestion
Function: The first chamber collects sewage and organic waste (blackwater and greywater). Within this sealed Bio Collection tank, Ergon’s proprietary Bio Coating on Collection Tank along with bacterial enzymes initiate a natural Anaerobic decomposition process ,breaking down fecal matter, grease, starch, and other organic waste materials Inside the primary digestion chamber, complex organic waste undergoes sequential biological and chemical transformations (Ergon Bio Cleanser Process)
Stage II Secondary – Ergon Bio Evaporation Tank(HSN 6810) Aerobic + Evapotranspiration
Function: The second stage treats pre-digested effluent in an aerobic environment , enabling natural oxidation and evaporation,
Mechanism: Through Aerobic bacterial activity , carbon dioxide compression increases soil temperature, enhancing natural evaporation of water via Evapotranspiration — a process where water is absorbed by surrounding soil and released as vapor into the atmosphere.
- Carbon Oxidation-C₆H₁₂O₆ + 6 O₂ → 6 CO₂ + 6 H₂O
- Nitrification-NH₃ + 2 O₂ → NO₃ + H₂O
- Photosynthetic Oxygenation (Plant Root Zone) CO₂ + H₂O → C₆H₁₂O₆ + O₂ (Photosynthetic Oxygenation)
Environmental Benefits: Soil
- ✅ Converts wastewater into harmless vapor and CO₂
- ✅ Prevents harmful gases like Methane CH₄, Sulphur Dioxide SO₂, and Carbon Monoxide CO, and H₂S formation
- ✅ Safe for soil and groundwater, No discharge or contamination risk.
- ✅ Good Soil; Standard installation, no additives
- ✅ Clay / Marsh / Rocky / Waterlogged Soil - Bio Evaporation Tank Needs, Requires M-sand filling( heat Impact)
The system’s unique Evapotranspiration design ensures “Zero Output” — meaning no untreated water leaves the tank , aligning with Green Building Compliance and PCB (Pollution Centerboard) certification standards,
Evapotranspiration Outputs : Water is transferred back into the atmosphere through:
Evaporation (from soil and surface) H₂O vapor Transpiration (through plant leaves) O₂ release
Zero effluent discharge. Major Biological Gases (Safely Neutralized)
Methane (CH₄) – 60–70%
Carbon Dioxide (CO₂) – 30–40%
Hydrogen Sulfide (H₂S) Ammonia (NH₃)
Trace gases: H₂, N₂, mercaptans, CO
All neutralized via biological oxidation + ET layer , ensuring safe operation. This makes the Ergon Bio Tank IGBC Net Zero Energy and Net Zero Water-safe. .
Technical Highlights
| Feature | Specification |
|---|
| System Type | Anaerobic + Aerobic + Evapotranspiration |
| Power Requirement | Nil (Self-operating natural process) |
| Maintenance | Zero – No mechanical parts |
| Odor Control | 100% odorless (enzyme neutralization) |
| Applications | Residential, Villas, Resorts, Institutions, Industries
Available from 1 KL to 500 KL capacity |
| Eco Certification | Green Building & PCB Compliant – Net Zero Discharge |
Environmental Impact : The Ergon Bio Tank system redefines sustainable wastewater management
through natural science and biotechnology
🌱 Zero Pollution – no discharge to surface drains
💧 Groundwater Safety – prevents contamination
☀️ Energy Conservation – no power required
🌾 Eco Integration – mimics natural purification
Ergon Installed Projects – Year & State Wise
| Year | State / Location | Profile / Project Type | Client Name | Capacity | Ergon System |
|---|
| 2018 | Chennai, TN | Factory | INOX – Sriperumbudur | 20 KL | Bio Tank |
| 2018 | Pondicherry | Resort | Resort Project | 100 KL | Grey Bio STP Bore |
| 2018 | TN – Tiruvannamalai | Villa | Er. Anand | 15 KL | Bio Tank |
| 2020 | Karaikal | Residence | Anugraha Builders | 10 KL | Bio Tank |
| 2020 | Pondicherry | Builders | Friends Construction | 20 KL | Bio Tank |
| 2020 | Chennai | Flats (Live Project) | Builder | 250 KL | Bio Septic Tank |
| 2020 | Chennai | Flats (Live Project) | Builder | 350 KL | Grey Bio STP Bore |
| 2021 | TN – Ariyalur | Residence | Mr. Muruganthan (NRI) | 10 KL | Bio Tank |
| 2021 | Chennai | Factory | Foxconn | 15 KL | Bio Tank |
| 2021 | Chennai | Bungalow | Ar. Marshal | 10 KL | Bio Tank |
| 2021 | TADA, Andhra | Factory | Saint-Gobain | 15 KL | Bio STP |
| 2021 | TN – Yelagiri | Hotel | Hotel Green | 20 KL | Bio STP |
| 2022 | Chennai | Hospital | Saveetha Eng. College | 5 KL | Bio STP |
| 2022 | Chennai | Hospital | Saveetha Eng. College | 10 KL | Grey Bio STP Bore |
| 2022 | Chennai | Multiplex | Vijay Park Multiplex | 200 KL | Grey Bio STP Bore |
| 2022 | Chennai | Factory | INOX – Hosur | 20 KL | Bio Tank |
| 2022 | Chennai | Hospital | Saveetha Dental College | 30 KL | Bio STP |
| 2022 | Coorg, KA | Resort | Time Share | 50 KL | Flushing |
| 2022 | TN – Mayiladuthurai | Builders | Salaya Builders | 6 KL | Bio Tank |
| 2023 | Chennai | Factory | Foxconn – Paddappai | 40 KL | STP Setup |
| 2023 | TN – Tirupur | Garments Factory | Suresh Garments | 15 KL | Bio Tank |
| 2023 | Perundurai | Factory | Sai Textiles | 20 KL | Bio Septic Tank |
| 2024 | TN – Yelagiri | Resort | P.A. Hotels | 15 KL | Ergon Clean |
| 2024 | Mumbai, MH | IT Park | HLL – Head Office | 260 KL | Ergon Clean |
| 2024 | Chennai | Builder Project | Villa House | 300 KL |
|